How many photos does your site need? Think in zones

A practical way to plan photo coverage for any site — enough proof, without overloading your team.

Photo planning isn't about square feet — it's about how many meaningful areas exist and how visible each needs to be.

Three principles

1. One photo per zone, as a baseline. A zone is any space your crew is responsible for — restroom, lobby, office floor, stairwell, kitchen. List every area in the scope of work; that list is your baseline photo count.

2. Add one more for critical zones. Some areas carry higher stakes. Ask: if this area had an issue, who would care most? If the answer is "the client, immediately" — it's critical, give it a second photo.

3. One photo is enough for large areas. For warehouses, hallways, and other big or uniform spaces, assign just one photo — and give that slot several reference photos. Each shift, the app picks which reference the worker matches, so a single simple task builds a rich, rotating record of the whole space over time.

Judging criticality

High — add a photo:

  • Client-facing areas — entrances, lobbies, reception. First impressions.

  • Hygiene-sensitive spaces — restrooms, kitchens, break rooms. Health and compliance implications.

  • Areas with a complaint history — a second photo closes the loop on recurring concerns.

Standard — one photo:

  • Private or back-of-house areas (offices, storage, server rooms).

  • Uniform, repeating spaces — one photo per floor level is reasonable.

Low — one photo for the set:

  • Large open or outdoor areas — warehouses, parking, perimeters.

Always prioritise problem areas: past complaints, high-traffic zones, compliance-sensitive areas, and anything explicitly named in the client's contract deserve extra coverage. Those photos protect both you and your client.

A worked example: 3-floor office building

Zone

Criticality

Photos

Why

Main entrance and lobby

High

2

First impression — visible immediately

Restrooms (per floor)

High

2

Hygiene-sensitive, most common complaint source

Break room / kitchen

High

2

Food hygiene, high traffic

Open office floor

Standard

1

Large but uniform — one overview

Conference rooms

Standard

1

Client-visible but consistent

Stairwells

Low

1

Low visibility, low complaint history

Hallways

Low

1

One wide shot per floor

Total: about 20 photos for a typical 3-floor building. Adjust up for problem history, down for simpler layouts.

Both sides win

A good photo plan serves two audiences at once. You get proof that every zone in scope was cleaned, timestamped evidence against disputes, and supervisor review without being on site. Your client gets visibility into the areas they care about, consistent documentation for their reporting, and assurance the service matches what was agreed.

Want a second opinion on your photo plan? Message us — we'll review it with you.